September 2022

18/10/2022 by Steiner SA

In September, the Steiner teams can remove the scaffolding as the railings are installed and the waterproofing resin is applied to the passageways.

The exterior brick facades continue to be laid from the bottom to the top, at the same time as the exterior fittings progress gradually with the pouring of sandblasted concrete and the laying of gutters along the building.

Inside the building, it is now the tilers’ turn to work in the bathrooms as well as the toilets, kitchen, laundry and cleaning rooms.

The carpenters are installing the cupboards and kitchens, while the installation of the wood fibre ceilings is being completed in the classrooms. This will allow the technical staff (ventilation, electricians) to continue their work in these rooms where all the technical equipment is visible and therefore under the finished ceiling.

Share on Social Media
twitter facebook linkedin emailwhatsapp

Post navigation

Previous Post:

August 2022

Next Post:

October et November 2022

Réseaux sociaux

  • Youtube
  • Instagram
  • LinkedIn
© 2023 Chantier Ecolint-EYE | WordPress Theme by Superbthemes